• Image 01
  • Image 02
  • Image 03
  • Image 04
  • Image 05
  • Image 06
Need assistance? Contact Us: 1-800-255-5897

Menu

  • Home
  • About Us
    • Company Overview
    • Management Team
    • Board of Directors
  • Your Loan Service Center
  • MAKE A PAYMENT
  • Business Service Center
  • Contact Us
  • Home
  • About Us
    • Company Overview
    • Management Team
    • Board of Directors
  • Your Loan Service Center
  • MAKE A PAYMENT
  • Business Service Center
  • Contact Us
Recent Quotes
View Full List
My Watchlist
Create Watchlist
Indicators
DJI
Nasdaq Composite
SPX
Gold
Crude Oil
Markets
Stocks
ETFs
Tools
Markets:
Overview
News
Currencies
International
Treasuries

Advanced Digital Optimization Solutions From Xylem Reduce Sewer Overflows by 247 Million Gallons Annually

By: 3BL Media
August 16, 2021 at 06:00 AM EDT
ⓘ This article is third-party content and does not represent the views of this site. We make no guarantees regarding its accuracy or completeness.

Innovative installation saves money while advancing sustainability

SOURCE: Xylem Inc.

DESCRIPTION:

The Metropolitan Sewer District (MSD) of Greater Cincinnati serves an Ohio population of more than 850,000 spread out across 290 square miles. Like many large cities, Cincinnati MSD operates combined storm water and sanitary sewer systems, some of which were constructed more than a century ago. These systems were built to collect rainwater runoff, domestic sewage and industrial wastewater in the same pipe. Whether by design, or due to infiltration and inflow of storm water, they have a tendency to overflow, discharging untreated sewage into local waterways or flooding streets and basements.

Cincinnati’s sewers were discharging an average of 14.4 billion gallons of combined sewage every year into the Ohio River and its tributary streams within Cincinnati’s urban watershed. In 2002, the U.S. Environmental Protection Agency entered into a federal consent decree with MSD, mandating the elimination of sanitary sewer overflows and significant mitigation of combined sewer overflows into receiving waterways. Engineers estimated the cost to mitigate the sewer overflows through capital investments such as deep tunnel construction, at $3.1 billion, an unacceptable capital expense to pass along to MSD’s customers.

To overcome these challenges MSD partnered with Xylem to optimize the performance of their existing assets through advanced digital optimization solutions. Xylem worked with MSD to implement Xylem’s Wastewater Network Optimization solution, which utilizes a combination of sensors and weather data to create a real-time decision support system (RT-DSS). This platform delivers automated, optimized control of existing assets to reduce sewage overflows, improve storage and maximize treatment plant operations during wet weather.

The project was an overwhelming success. After MSD implemented a coordinated real-time control (RTC) program, overflow volumes were reduced by 247 million gallons annually (based on 2015 rainfall), a 45 percent reduction in overflow compared to the original design. Additionally, operational enhancements from the project increased treatment facility utilization by more than 100 percent, as a result of using the existing assets more efficiently.

MSD continues to expand the wastewater network optimization solution across their system, delivering savings to rate-payers, while protecting the local watershed to make the city more sustainable.

Learn more about Xylem’s digital solutions for water operators.

Learn more about how Xylem helps customers advance sustainability in their communities.

Tweet me: Advanced digital optimization solutions from @XylemInc reduce sewer overflows by 247 million gallons annually, saving money while advancing #sustainability: https://bit.ly/3fSvtC9

KEYWORDS: Xylem, Cincinnati, Metropolitan Sewer District of Greater Cincinnati, NYSE: XYL, water, wastewater

Report this content

If you believe this article contains misleading, harmful, or spam content, please let us know.

Report this article

More News

View More
News headline image
Delcath Systems Q2 Earnings Call Highlights ↗
Today 12:04 EDT
Via MarketBeat
Topics Earnings
Tickers DCTH
News headline image
Datadog Q2 Earnings Call Highlights ↗
Today 12:04 EDT
Via MarketBeat
Topics Artificial Intelligence Earnings
Tickers DDOG NVDA
News headline image
Driven Brands Q2 Earnings Call Highlights ↗
Today 12:04 EDT
Via MarketBeat
Topics Earnings
Tickers DRVN
News headline image
Charles River Associates Q2 Earnings Call Highlights ↗
Today 12:03 EDT
Via MarketBeat
Topics Earnings Intellectual Property
Tickers CRAI
News headline image
Cronos Group Q2 Earnings Call Highlights ↗
Today 12:03 EDT
Via MarketBeat
Topics Cannabis Earnings
Tickers CRON

Recent Quotes

View More
Symbol Price Change (%)
AMZN  273.37
+0.72 (0.26%)
AAPL  310.16
-0.84 (-0.27%)
AMD  488.25
+6.19 (1.29%)
BAC  62.99
-0.26 (-0.41%)
GOOG  358.22
-1.91 (-0.53%)
META  589.55
+0.78 (0.13%)
MSFT  495.03
+7.57 (1.55%)
NVDA  218.31
-0.91 (-0.42%)
ORCL  143.81
-0.57 (-0.40%)
TSLA  318.49
-3.06 (-0.95%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.
© 2025 FinancialContent. All rights reserved.

Having difficulty making your payments? We're here to help! Call 1-800-255-5897

Copyright © 2019 Franklin Credit Management Corporation
All Rights Reserved
Contact Us | Privacy Policy | Terms of Use | Sitemap