ETFOptimize | High-performance ETF-based Investment Strategies

Quantitative strategies, Wall Street-caliber research, and insightful market analysis since 1998.


ETFOptimize | HOME
Close Window

Shimmick Announces New Contracts in California and Washington

IRVINE, Calif., Sept. 16, 2025 (GLOBE NEWSWIRE) -- Shimmick Corporation (“Shimmick” or the “Company”) (Nasdaq: SHIM), a national leader in complex infrastructure solutions, has been selected for award on two new contracts that highlight its expertise in delivering critical transportation projects: the Santa Monica Pier Bridge Replacement Project in California and the Renton Transit Center Project in Washington.

Together, these projects reinforce Shimmick’s leadership in building resilient, sustainable infrastructure that enhances community mobility, safeguards historic landmarks, and supports regional growth ahead of global events like the 2028 Los Angeles Summer Olympics.

“These two projects reflect the breadth of Shimmick’s expertise — from preserving access to one of the nation’s most iconic landmarks to building modern transit systems that support sustainable mobility,” said Ural Yal, CEO of Shimmick. “We are honored to partner with the City of Santa Monica for the first time and with Sound Transit again to deliver projects that not only improve safety and connectivity but also create lasting value for communities.”

Santa Monica Pier Bridge Replacement

Shimmick was selected for the $29.6 million Santa Monica Pier Bridge Replacement Project, which will replace the 85-year-old Colorado Avenue Bridge — the only vehicular and pedestrian access point to the iconic Santa Monica Pier. Shimmick will construct a new bridge, demolish the old one, enhance pedestrian access, and restore the historic Santa Monica Pier Arched Neon Sign while safeguarding historic assets. Work is expected to begin in the last quarter of 2025 and will take 22 months, with completion scheduled before the Los Angeles 2028 Summer Olympics.

Renton Transit Center

This $48.2 million contract by Sound Transit is for the Renton Transit Center and Roadway Improvements project in Renton, Washington. The project encompasses the construction of a state-of-the-art transit center designed to support the Puget Sound region’s growing mobility needs, including a new bus bay island with capacity for eight active bays and a custom steel canopy structure, infrastructure development for a Battery Electric Bus (BEB) equipment yard to advance sustainable transit, and roadway improvements to create a dedicated bus-only lane. This investment is expected to significantly improve commuter mobility, reduce congestion, and advance Sound Transit’s long-term sustainability goals.

About Shimmick
Shimmick (NASDAQ: SHIM) is an industry leader in delivering turnkey infrastructure solutions that strengthen critical markets across water, energy, climate resiliency, and sustainable transportation. We integrate technical excellence with collaborative project delivery methods to provide innovative, technology-driven infrastructure solutions that accelerate economic growth and empower communities nationwide. With a track record that spans over a century, Shimmick, headquartered in California, unites deep engineering heritage with entrepreneurial spirit to tackle today's most complex infrastructure challenges. For more information, visit shimmick.com.

Investor Relations:
IR@shimmick.com
1-949-704-2350

Media Contact:
Tonya Sandman
tonya.sandman@shimmick.com


Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms Of Service.


 

IntelligentValue Home
Close Window

DISCLAIMER

All content herein is issued solely for informational purposes and is not to be construed as an offer to sell or the solicitation of an offer to buy, nor should it be interpreted as a recommendation to buy, hold or sell (short or otherwise) any security.  All opinions, analyses, and information included herein are based on sources believed to be reliable, but no representation or warranty of any kind, expressed or implied, is made including but not limited to any representation or warranty concerning accuracy, completeness, correctness, timeliness or appropriateness. We undertake no obligation to update such opinions, analysis or information. You should independently verify all information contained on this website. Some information is based on analysis of past performance or hypothetical performance results, which have inherent limitations. We make no representation that any particular equity or strategy will or is likely to achieve profits or losses similar to those shown. Shareholders, employees, writers, contractors, and affiliates associated with ETFOptimize.com may have ownership positions in the securities that are mentioned. If you are not sure if ETFs, algorithmic investing, or a particular investment is right for you, you are urged to consult with a Registered Investment Advisor (RIA). Neither this website nor anyone associated with producing its content are Registered Investment Advisors, and no attempt is made herein to substitute for personalized, professional investment advice. Neither ETFOptimize.com, Global Alpha Investments, Inc., nor its employees, service providers, associates, or affiliates are responsible for any investment losses you may incur as a result of using the information provided herein. Remember that past investment returns may not be indicative of future returns.

Copyright © 1998-2017 ETFOptimize.com, a publication of Optimized Investments, Inc. All rights reserved.