ETFOptimize | High-performance ETF-based Investment Strategies

Quantitative strategies, Wall Street-caliber research, and insightful market analysis since 1998.


ETFOptimize | HOME
Close Window

DanReDev, Kaufman Development & Oldivai Announce Major 2026 Projects Nationwide

By: PRLog
Project Zero data centers, nationwide workforce housing, and new build-to-rent communities headline the 2026 expansion under Founder & CEO Daniel Kaufman, advancing real estate, technology, construction, and investment innovation.

DALLAS - Dec. 10, 2025 - PRLog -- DanReDev LLC, Kaufman Development, and Oldivai today announced a comprehensive slate of projects launching throughout 2026 across the United States. Guided by Founder & CEO Daniel Kaufman, the combined platform is accelerating its integrated real estate strategy spanning property, investment, construction, architecture, technology, and startup-level development execution.

The 2026 pipeline includes AI-ready micro-data centers, workforce housing communities, build-to-rent neighborhoods, and mixed-use projects across major growth markets. This expansion reinforces the national footprint of Daniel Kaufman Real Estate and positions the platform at the intersection of real estate and next-generation infrastructure.

2026 NATIONAL PROJECT PIPELINE

Below is the quarter-by-quarter rollout schedule for the company's 2026 developments.

Q1 2026 LAUNCHES

Project Zero Detroit – AI Micro Data Center (Phase 1 Commissioning)


Location: Detroit, Michigan
Capacity: 5 MW AI-optimized micro-data-center module
Specs: High-density cooling, modular pods, N+1 redundancy

Detroit will serve as the first operational Project Zero facility, providing localized AI compute for logistics, industrial firms, autonomous systems, and enterprise clients. Commissioning begins in Q1 with full operational status expected by early Q2.

Key Milestone:
  • Module testing & validation (January–March 2026)
  • Power-on and AI inference loads (March 2026)

Oldivai Workforce Housing – Spokane, WA (Stabilization Complete)

Location: Spokane, Washington
Units: 48-unit modular workforce housing community
Status: Completed; entering stabilization phase
2026 Focus: Program expansion, employer partnerships, resident financial-education rollout

This project serves as Oldivai's successful pilot for national scale.

Q2 2026 LAUNCHES

Project Zero – Dallas / North Texas AI Micro-Data Center (New Site Launch)


Location: Dallas–Fort Worth Industrial Corridor
Capacity: 8–10 MW AI-edge facility
Use Cases: AI enterprise workloads, telecom, logistics AI, industrial robotics

This site will serve as a central hub for the southern U.S., with access to abundant power and high-bandwidth fiber routes.

Oldivai Workforce Housing – Central Texas (Construction Start)

Location: San Marcos / Greater Austin workforce corridor
Units: 110–140 units
Construction: Modular + panelized hybrid system
Target Residents: Medical workers, educators, hospitality staff, distribution-center employees

Groundbreaking: May 2026
Delivery: Q2 2027

DanReDev BTR Community – Jacksonville, Florida

Units: 160–180 BTR townhomes
Specs: 2–3 bedroom units, smart home integration, EV-ready garages
Construction Start: April 2026
First Deliveries: Early 2027

This project anchors the Florida BTR expansion plan.

Q3 2026 LAUNCHES

Project Zero – Northeast Corridor Micro-Data Center (Site Selection & Phase 1 Start)


Target Markets:
  • Northern New Jersey
  • South Boston industrial district
  • Hartford metro

Capacity Range: 4–7 MW per site
2026 Milestone: First Northeast PZ site to break ground (September 2026)

This expansion supports enterprise AI workloads in one of the country's densest, highest-demand compute regions.

Oldivai Workforce Housing – Tacoma, Washington

Units: 85–120
Construction Start: August 2026
Design: Mass timber & modular blend
Focus: Shipping/logistics workforce, port-dependent industry employees

DanReDev BTR Community – Kansas City Metro

Units: 140–160
Features:
  • Community clubhouse
  • Private yards
  • Smart-building automation
  • Solar-ready infrastructure

Construction Start: July 2026

Q4 2026 LAUNCHES

Project Zero – California (West Coast AI Infrastructure Cluster)


Locations:
  • Inland Empire high-power industrial zone
  • Central Valley (data-center friendly utility corridors)
  • Sacramento region

Cluster Capacity: 15–22 MW combined
Phasing: Execution begins October 2026 with power reservations secured in December.

This West Coast cluster supports AI compute demand from manufacturing, agriculture, logistics, and autonomous-vehicle R&D.

Oldivai Workforce Housing – Maine Expansion (New Launch)

Location: Greater Portland / Lewiston–Auburn corridor
Units: 70–100 units
Delivery Model: Cold-climate modular with high-efficiency systems
Start: November 2026

A strategic attempt to support hospital systems, universities, trades, and seasonal-to-year-round workforce needs.

DanReDev Mixed-Use Urban Infill – Chicago South Suburbs

Units: 200–220
Components:
  • Multifamily
  • Retail pads
  • Neighborhood services

Start: December 2026

This is part of the Midwest urban-infill strategy for 2026–2028.

CEO STATEMENT

Founder & CEO Daniel Kaufman emphasized the platform's integrated approach:

"Our 2026 launch slate marks the full convergence of real estate and technology. AI infrastructure, workforce housing, modular construction, BTR communities — these are no longer separate categories. They are one ecosystem, and we are building that ecosystem at national scale. This is the next evolution of Daniel Kaufman Real Estate."

"Project Zero is our infrastructure backbone. Oldivai is our housing engine. DanReDev is our community-development arm. Together they position us to deliver high-impact projects across multiple markets with speed, quality, and long-term value creation."


ABOUT THE COMPANIES

DanReDev LLC


A Dallas-based real estate development platform focused on BTR communities, mixed-use infill, modular-forward development, and strategic capital partnerships. DanReDev blends startup execution with institutional discipline across housing and community-scale assets.

Kaufman Development

A national real estate development and investment firm operating in California, Texas, Florida, the Midwest, New England, and the Northeast. Focus areas include multifamily, BTR, hospitality, AI-ready infrastructure, and emerging digital-industrial assets.

Oldivai

A mission-driven housing company delivering workforce housing through modular construction and replicable design systems. Oldivai Properties manages stabilized communities and provides financial-education and advancement tools for residents.

MEDIA CONTACT

Media Relations – DanReDev LLC / Kaufman Development / Oldivai
Email: info@danredevllc.com
Phone: 972-807-3157
Web: www.danredevllc.com


Contact
Media Relations
***@danredevllc.com

Photos: (Click photo to enlarge)

DanReDev Logo Founder & CEO Daniel Kaufman


Source: DanReDev LLC

Read Full Story - DanReDev, Kaufman Development & Oldivai Announce Major 2026 Projects Nationwide | More news from this source

Press release distribution by PRLog

Recent Quotes

View More
Symbol Price Change (%)
AMZN  227.35
+0.59 (0.26%)
AAPL  273.67
+1.48 (0.54%)
AMD  213.43
+12.37 (6.15%)
BAC  55.27
+1.01 (1.86%)
GOOG  308.61
+4.86 (1.60%)
META  658.77
-5.68 (-0.85%)
MSFT  485.92
+1.94 (0.40%)
NVDA  180.99
+6.85 (3.93%)
ORCL  191.97
+11.94 (6.63%)
TSLA  481.20
-2.17 (-0.45%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.


 

IntelligentValue Home
Close Window

DISCLAIMER

All content herein is issued solely for informational purposes and is not to be construed as an offer to sell or the solicitation of an offer to buy, nor should it be interpreted as a recommendation to buy, hold or sell (short or otherwise) any security.  All opinions, analyses, and information included herein are based on sources believed to be reliable, but no representation or warranty of any kind, expressed or implied, is made including but not limited to any representation or warranty concerning accuracy, completeness, correctness, timeliness or appropriateness. We undertake no obligation to update such opinions, analysis or information. You should independently verify all information contained on this website. Some information is based on analysis of past performance or hypothetical performance results, which have inherent limitations. We make no representation that any particular equity or strategy will or is likely to achieve profits or losses similar to those shown. Shareholders, employees, writers, contractors, and affiliates associated with ETFOptimize.com may have ownership positions in the securities that are mentioned. If you are not sure if ETFs, algorithmic investing, or a particular investment is right for you, you are urged to consult with a Registered Investment Advisor (RIA). Neither this website nor anyone associated with producing its content are Registered Investment Advisors, and no attempt is made herein to substitute for personalized, professional investment advice. Neither ETFOptimize.com, Global Alpha Investments, Inc., nor its employees, service providers, associates, or affiliates are responsible for any investment losses you may incur as a result of using the information provided herein. Remember that past investment returns may not be indicative of future returns.

Copyright © 1998-2017 ETFOptimize.com, a publication of Optimized Investments, Inc. All rights reserved.