• Image 01
  • Image 02
  • Image 03
  • Image 04
  • Image 05
  • Image 06
Need assistance? Contact Us: 1-800-255-5897

Menu

  • Home
  • About Us
    • Company Overview
    • Management Team
    • Board of Directors
  • Your Loan Service Center
  • MAKE A PAYMENT
  • Business Service Center
  • Contact Us
  • Home
  • About Us
    • Company Overview
    • Management Team
    • Board of Directors
  • Your Loan Service Center
  • MAKE A PAYMENT
  • Business Service Center
  • Contact Us
Recent Quotes
View Full List
My Watchlist
Create Watchlist
Indicators
DJI
Nasdaq Composite
SPX
Gold
Crude Oil
Markets
Stocks
ETFs
Tools
Markets:
Overview
News
Currencies
International
Treasuries

Rock Solid Warns Homeowners to Check Septic Capacity Before Adding Bedrooms

By: Press Release Distribution Service
October 01, 2026 at 08:48 AM EDT
ⓘ This article is third-party content and does not represent the views of this site. We make no guarantees regarding its accuracy or completeness.

Rock Solid Septic & Excavation advises Upstate South Carolina homeowners to verify existing septic system capacity before adding bedrooms during renovations. Under South Carolina Regulation 61-56, bedroom count affects minimum tank size, but drainfield capacity and approved wastewater flow must also be checked before alterations

Spartanburg, United States, October 1, 2026 -- Rock Solid Warns Homeowners to Check Septic Capacity Before Adding Bedrooms

Upstate South Carolina septic contractor says bedroom additions can affect approved wastewater flow even when the existing tank still meets minimum size requirements.

Rock Solid Septic & Excavation is advising Upstate South Carolina homeowners to verify their existing septic system capacity before adding bedrooms as part of a home renovation, addition, or conversion project.

The company issued the reminder alongside its updated guide to septic tank sizing in South Carolina, which explains how bedroom count affects septic tank requirements and how drainfield sizing is determined separately. Under South Carolina Regulation 61-56, homes with one to four bedrooms require a septic tank with at least 1,000 gallons of net liquid capacity. Each bedroom beyond four increases the minimum tank capacity by 250 gallons. That means a five-bedroom home requires at least 1,250 gallons, while a six-bedroom home requires at least 1,500 gallons.

Rock Solid says homeowners should not assume that staying within the same tank-size category means no septic changes are required.

“A three-bedroom house and a four-bedroom house can both use a 1,000-gallon tank under the state minimum, but that does not mean the whole septic system is automatically approved for the additional bedroom,” said John (Ivan) Rusev, Co-owner and Operations Manager of Rock Solid Septic & Excavation. “The additional bedroom increases the design wastewater flow, so the existing system and drainfield still need to be checked before the alteration moves forward.”

The distinction is important because septic tank capacity and drainfield capacity are not determined in the same way. Bedroom count establishes the minimum tank size, while drainfield sizing also depends on approved wastewater flow, soil conditions, and the site's long-term acceptance rate. Under Section 302 of Regulation 61-56, an alteration that increases wastewater flow requires an application and a Permit to Construct for the septic system upgrade or expansion before the alteration is made.

For homeowners moving from four bedrooms to five or more, both sides of the system may become an issue. The minimum tank capacity increases, and the existing drainfield may also need to be expanded depending on its approved capacity and site conditions.

Rusev recommends checking the existing septic permit and system design early in the remodeling process rather than after construction plans are already finalized.

“We would rather have someone find out what their system can support while they are still planning the project,” Rusev said. “Finding out later that the drainfield needs to be expanded, or that the tank no longer meets the minimum, can change the scope of the job pretty quickly.”

The company's new guide, “Septic Tank Size: What Size Septic Tank Do You Actually Need?”, provides a detailed breakdown of South Carolina septic tank sizing rules, common residential tank sizes, drainfield considerations, and what homeowners should know when replacing or upgrading an existing system.

Rock Solid Septic & Excavation provides septic installation, pumping, inspections, repairs, drainfield services, septic-to-sewer conversions, grease trap cleaning, and excavation throughout Spartanburg, Greenville, Anderson, Cherokee, and Pickens counties.

Homeowners planning an addition or trying to determine whether an existing septic system can support a higher bedroom count can contact Rock Solid Septic & Excavation at (864) 431-2822.

About Rock Solid Septic & Excavation

Rock Solid Septic & Excavation is a locally owned septic and excavation company based in Spartanburg, South Carolina. It serves homeowners and businesses within a 40-mile radius of Spartanburg and holds a 5.0 rating across 179 Google reviews. The company is known for transparent, published pricing and round-the-clock emergency response.

Media Contact

John (Ivan) Rusev, Co-owner

Rock Solid Septic & Excavation

Phone: (864) 431-2822

Email:info@rocksolidexcavationsc.com

Website:rocksolidexcavationsc.com

Contact Info:
Name: John (Ivan) Rusev
Email: Send Email
Organization: Rock Solid Septic & Excavation
Address: SPARTANBURG
Phone: (864) 431-2822
Website: https://rocksolidexcavationsc.com

Release ID: 89204969

If there are any deficiencies, discrepancies, or concerns regarding the information presented in this press release, we kindly request that you promptly inform us by contacting error@releasecontact.com (it is important to note that this email is the authorized channel for such matters, sending multiple emails to multiple addresses does not necessarily help expedite your request). Our dedicated team is committed to addressing any identified issues within 8 hours to guarantee the delivery of accurate and reliable content to our esteemed readers.

Report this content

If you believe this article contains misleading, harmful, or spam content, please let us know.

Report this article

More News

View More
News headline image
Cellectis Unveils In Vivo Gene-Editing Plans for Severe Lipid Disorders ↗
Today 16:02 EDT
Via MarketBeat
Tickers CLLS
News headline image
NextEra Energy Eyes 18 GW Gas Opportunity, Targets Dominion Deal Growth ↗
Today 15:02 EDT
Via MarketBeat
Topics Economy
Tickers NEE
News headline image
Everyone in AI Is Quietly Copying Palantir's Playbook ↗
Today 14:25 EDT
Via MarketBeat
Topics Artificial Intelligence Initial Public Offering
Tickers GOOGL META NBIS PLTR
News headline image
Advanced Micro Devices Is Spending $8.2 Billion to Learn What AI Needs Next ↗
Today 13:50 EDT
Via MarketBeat
Topics Artificial Intelligence
Tickers AMD NVDA
News headline image
JPMorgan Bets on Genius Sports as the Market Loses Patience ↗
Today 13:15 EDT
Via MarketBeat
Tickers DKNG FLUT GENI JPM MGM SRAD

Recent Quotes

View More
Symbol Price Change (%)
AMZN  248.23
-0.92 (-0.37%)
AAPL  330.32
-2.70 (-0.81%)
AMD  615.73
+3.97 (0.65%)
BAC  53.73
-0.70 (-1.29%)
GOOG  334.93
-5.81 (-1.71%)
META  725.93
+0.75 (0.10%)
MSFT  512.80
-0.10 (-0.02%)
NVDA  230.86
+2.48 (1.09%)
ORCL  138.07
+0.77 (0.56%)
TSLA  354.11
-0.70 (-0.20%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.
© 2025 FinancialContent. All rights reserved.

Having difficulty making your payments? We're here to help! Call 1-800-255-5897

Copyright © 2019 Franklin Credit Management Corporation
All Rights Reserved
Contact Us | Privacy Policy | Terms of Use | Sitemap