• Image 01
  • Image 02
  • Image 03
  • Image 04
  • Image 05
  • Image 06
Need assistance? Contact Us: 1-800-255-5897

Menu

  • Home
  • About Us
    • Company Overview
    • Management Team
    • Board of Directors
  • Your Loan Service Center
  • MAKE A PAYMENT
  • Business Service Center
  • Contact Us
  • Home
  • About Us
    • Company Overview
    • Management Team
    • Board of Directors
  • Your Loan Service Center
  • MAKE A PAYMENT
  • Business Service Center
  • Contact Us
Recent Quotes
View Full List
My Watchlist
Create Watchlist
Indicators
DJI
Nasdaq Composite
SPX
Gold
Crude Oil
Markets
Stocks
ETFs
Tools
Markets:
Overview
News
Currencies
International
Treasuries

E3 Lithium Plans to Construct a Fully Integrated Lithium Demonstration Facility

By: PressReach
August 08, 2024 at 11:06 AM EDT

CALGARY, Alberta, August 08, 2024–E3 LITHIUM LTD. (TSXV:ETL) (FSE:OW3) (OTCQX:EEMMF), “E3 Lithium” or the “Company,” a leader in Canadian lithium, is pleased to announce its plan to build a fully integrated Lithium Brine Demonstration Facility (the “Demo Project”) with the goal to produce battery grade lithium carbonate from brines located within the Leduc reservoir in Alberta. The Demo Project takes a significant step forward in the Company’s strategic plan to develop a commercial lithium facility that will reinforce western Canada as a major lithium resource jurisdiction.

The Demo Project will be an advancement from the successful Direct Lithium Extraction (“DLE”) pilot program conducted in 2023. The Company operated and evaluated multiple technologies, showcasing the technical feasibility of DLE technology including its own proprietary DLE. The 2023 pilot provided critical data used in the recently released Pre-Feasibility Study (“PFS”) validating the economic feasibility of lithium projects in Alberta.

The Demo Project will operate a fully integrated process that will include an increase in the scale of the DLE system and add into the processes for the purification, concentration and chemical conversion to continually process brine into battery grade lithium carbonate. Additional hydroxide developments will be conducted offsite. The objectives of the Demo Project are to unify the necessary components onsite into a fully integrated process replicating, as best as possible at a reduced scale, a commercial system. This will provide real-time data while the Company continues to design a commercial system through advanced engineering. It will also provide samples for commercial discussions with potential strategic partners. The Demo Project will enable the Company to continually optimize and de-risk each step of the flowsheet as it moves towards completing its feasibility study.

This facility is unique in Canada and will serve as an economic driver for Alberta’s battery supply chain. The Company will publish more details on the Demo Project over the coming months while it finalizes the design and operational aspects.

“We are thrilled to take this next step towards demonstrating the production of battery quality lithium carbonate from our Leduc Brine,” said Chris Doornbos, President and CEO of E3 Lithium. “E3 Lithium aims to be a direct supplier of products to the battery industry. The Demo Project is an important step towards progressing the Clearwater Project, providing samples to potential strategic partners and an overall advancement for lithium assets on a commercial scale in Alberta.”

ON BEHALF OF THE BOARD OF DIRECTORS
Chris Doornbos, President & CEO
E3 Lithium Ltd.

About E3 Lithium

E3 Lithium is a development company with a total of 16.0 million tonnes of lithium carbonate equivalent (LCE) Measured and Indicated and 0.9 million tonnes LCE Inferred mineral resources1 in Alberta. As outlined in E3’s Preliminary Economic Assessment, the Clearwater Lithium Project has an NPV8% of USD 1.1 Billion with a 32% IRR pre-tax and USD 820 Million with a 27% IRR after-tax1. E3 Lithium’s goal is to produce high purity, battery grade lithium products to power the growing electrical revolution. With a significant lithium resource and innovative technology solutions, E3 Lithium has the potential to deliver lithium to market from one of the best jurisdictions in the world.

1: The Preliminary Economic Assessment (PEA) for the Clearwater Lithium Project NI 43-101 technical report is amended Sept 17, 2021. Gordon MacMillan, P.Geol, QP, Fluid Domains Inc. and Grahame Binks, MAusIMM, QP (Metallurgy), formerly of Sedgman Canada Limited (Report Date: June 15, 2018, Effective Date: June 4, 2018, Amended Date: September 17, 2021). The mineral resource NI 43-101 Technical Report for the North Rocky Property, effective October 27, 2017, identified 0.9Mt LCE (inferred). The mineral resource NI 43-101 Technical Report for the Bashaw District Project, effective March 21, 2023, identified 16.0Mt LCE (measured & indicated). All reports are available on the E3 Lithium’s website (e3lithium.ca/technical-reports) and SEDAR+ (www.sedarplus.ca).

Forward-Looking and Cautionary Statements

This news release includes certain forward-looking statements as well as management’s objectives, strategies, beliefs and intentions. Forward looking statements are frequently identified by such words as “may”, “will”, “plan”, “expect”, “anticipate”, “estimate”, “intend” and similar words referring to future events and results. Forward-looking statements are based on the current opinions and expectations of management. All forward-looking information is inherently uncertain and subject to a variety of assumptions, risks and uncertainties, including the speculative nature of mineral exploration and development, fluctuating commodity prices, the effectiveness and feasibility of emerging lithium extraction technologies which have not yet been tested or proven on a commercial scale or on the Company’s brine, competitive risks and the availability of financing, as described in more detail in our recent securities filings available at www.sedarplus.ca. Actual events or results may differ materially from those projected in the forward-looking statements and we caution against placing undue reliance thereon. We assume no obligation to revise or update these forward-looking statements except as required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts

E3 Lithium – Investor and Media Relations
Alexis de la Renaudiere
Investor Relations
investor@e3lithium.ca
587-324-2775

Featured Image @ Freepik
Read more investing news on PressReach.com.Subscribe to the PressReach RSS feeds:
  • Featured News RSS feed
  • Investing News RSS feed
  • Daily Press Releases RSS feed
  • Trading Tips RSS feed
  • Investing Videos RSS feed

Follow PressReach on Twitter
Follow PressReach on TikTok
Follow PressReach on Instagram
Subscribe to us on Youtube

More News

View More
News headline image
Tesla Bulls vs. Bears Are Getting Loud Ahead of Earnings ↗
Today 9:34 EST
Via MarketBeat
Tickers TSLA
News headline image
Defense Spending Is Rising—Here Are 3 Stocks Built for Turbulent Times ↗
Today 8:23 EST
Via MarketBeat
Tickers BA EADSF LDOS LHX LMT RTX
News headline image
3M Earnings: Fundamentals and Capital Returns to Drive Highs in 2026 ↗
Today 7:12 EST
Via MarketBeat
Tickers MMM
News headline image
2 Ways to Trade Amazon Ahead of Earnings ↗
January 20, 2026
Via MarketBeat
Tickers AMZN
News headline image
Sea, Space, & Sky: 3 Frontier Robotics Stocks Under $20 ↗
January 20, 2026
Via MarketBeat
Tickers KITT ONDS PBR RDW SHEL

Recent Quotes

View More
Symbol Price Change (%)
AMZN  231.21
+0.21 (0.09%)
AAPL  246.76
+0.06 (0.02%)
AMD  245.63
+13.71 (5.91%)
BAC  52.65
+0.55 (1.06%)
GOOG  326.15
+3.99 (1.24%)
META  604.31
+0.19 (0.03%)
MSFT  451.01
-3.51 (-0.77%)
NVDA  180.56
+2.49 (1.40%)
ORCL  177.22
-2.70 (-1.50%)
TSLA  424.17
+4.92 (1.17%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.
© 2025 FinancialContent. All rights reserved.

Having difficulty making your payments? We're here to help! Call 1-800-255-5897

Copyright © 2019 Franklin Credit Management Corporation
All Rights Reserved
Contact Us | Privacy Policy | Terms of Use | Sitemap